Nov 16th update


Painting crew du Jour

Originally uploaded by bridge to biloxi.

Tonight is Open Mike night so this will be short.

Lilly’s and Luke’s rooms are painted. All the wood floors have a coat of varnish. The siding is done except the porch. 2 sides of the house are painted (base).

The plumbers fixed the vent pipes again. They also cut the holes for the faucets in the MBR tub surround. I also cut out the light switch in the study that was buried. That makes 3 electric boxes we covered up. I hope there are no surprises when they turn on the power.

I let Lilly walk on the new floor to see her room color, she loved it. Luke also likes his but he did not cry like Lilly.