Dec 7th update
We are coming down the home stretch. The house was a mad one today. Mike and Doug and Elizabeth and Beca did the base molding while Wright and Patrick and I finished the door trim. Art and Rob took on the sink (we are installing the sink temporarily so they can move in.) The sink looks great. We had so many people waiting to use the chop saw (that was bent and would not cut a 45) that I dropped everything and went to buy another one. HandsOn really needs it. Well, we only have a small bit of trim to do. No sooner had the sink been unveiled and the plumber showed up and started installing everything. After lunch Bri came to help with the putty. Tomorrow we will have 8 volunteers from a new group from Dartmouth to help with painting the trim. The cabinets are scheduled to come on the 19th and Mike may be able to help out, we will see.
Crystal will be coming home late Saturday night for Christmas break to new home. For those that want to send a Christmas card their address is: Cynthia and Dan Mceldowney, 334 Crawford St, Biloxi, MS 39530